Design / Build of New Parking Garage within active Airport operations.
New 4-level, 1,300 space Design/Build Parking Garage. The project timeline from start to finish was two weeks. A key feature of the presentation strategy was to present 3 different exterior facades as well as to showcase design and construction methods. The animation was beneficial in showing these elements resulting in a Project Win.
Scope of Services
Utilized Revit Model from D/B Architect for rendering, walkthrough, and construction sequence
Modeled site and landscaping from PDF Design Development Drawings
Created construction sequence animation & rendered completed images
Rendered three different skin options for the building facade as provided by the architecture team
Coordinated with 3D Print Vendor to provide the files they needed for 3D Printing
Included in the animation are unique details such as construction team signage on fencing, clear logistics and movement of construction vehicles, detailed landscaping of outside construction zoned area
Three (3) different facade design options.